@Hoban Equipment - Lathom Siding Topo 2015_01_28

Lathom Siding

1/28/2015 Created final strip surfaces for mainline siding and access road. Separated them into two surfaces. Used OG and dropped by 0.7m for missing section of main siding, used OG and dropped by 0.5m for missing section of access road. Calculated volume of strip for siding and access rd. Calculated volume of subballast for siding and volume of granular for access rd. (strip to 2015_01_24 surface). Exported points for siding subballast and access rd. FG. Exported strip surfaces and subballast / access rd. FG (2015_01_24) as DXF and XML.